Наверх
Hotline
8 800 220 0 220
Free across Russia

Samples of applications and contracts for technological connection

Прикрепленные файлы:
  • 07.03.2014 07.34 9. Technological connection by means of flux transfer (provided that receiving devices power of which is redistributed (donors) should be actually connected before January 1, 2009, with connected load above 15 kW) Triple Recipient acts as
    Скачать
    53 Kb, .doc
  • 07.03.2014 07.34 8. For applicants considered allied grid companies
    Скачать
    61 Kb, .doc
  • 07.03.2014 07.34 7. For applicants considered generating companies
    Скачать
    53.5 Kb, .doc
  • 07.03.2014 07.34 6. For applicants for the purpose of temporal connection (for no longer than 6 months) of power receivers with connected power under 100 kW (and including) with allowance for power previously connected to this point of connection (in case
    Скачать
    42 Kb, .doc
  • 07.03.2014 07.34 5. For applicants considered individuals, legal entities and individual entrepreneurs as custom design, not included in other forms, including requirements of Regulations and Methodical Guidelines taken into account inclusive of costs of
    Скачать
    62 Kb, .doc
  • 07.03.2014 07.34 4. For applicants considered individuals, legal entities and individual entrepreneurs as custom design, not included in other forms, including requirements of Regulations and Methodical Guidelines taken into account without costs of allie
    Скачать
    62 Kb, .doc
  • 07.03.2014 07.34 3. For applicants considered legal entities and individual entrepreneurs with connected power from15 up to 100 kW (in case of technological connection to electric grids of voltage class which does not exceed 20 kV if distance between avai
    Скачать
    44 Kb, .doc
  • 07.03.2014 07.34 2. For applicants considered legal entities and individual entrepreneurs with connected power up to 15 kW and including, with regard for power previously connected to this point of connection (in case of technological connection to electr
    Скачать
    42 Kb, .doc
  • 07.03.2014 07.34 1. For individual applicants with connected power up to 15 kW and including, with regard for power previously connected to this point of connection (in case of technological connection to electric grids of voltage class which does not exc
    Скачать
    40 Kb, .doc