Наверх
Hotline
8 800 220 0 220
Free across Russia

Standards

Прикрепленные файлы:
  • Order of Information Disclosure on Technological Connection of Electric Power Units and other Information, Necessary for Technological Connection of the Energy Units
    Скачать
    208 Kb, .doc
  • 07.03.2014 07.34 Consolidated Indices of Facility Cost of 35-750kV Substation and 6, 10-750kV Lines
    Скачать
    208 Kb, .doc
  • 07.03.2014 07.34  Integrated Management System
    Скачать
    299 Kb, .doc
  • 07.03.2014 07.34  Period of Work on Design, Construction and Reconstruction of Substations and Electric Power Transmission Lines
    Скачать
    154 Kb, .doc
  • 07.03.2014 07.34 Specification of Trial Technical Determination of Power Distribution by Electric Power Plants
    Скачать
    131 Kb, .doc